Form 6-K
Table of Contents

 
 
United States
Securities and Exchange Commission
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
of the
Securities Exchange Act of 1934
For the month of
February 2011
Vale S.A.
Avenida Graça Aranha, No. 26
20030-900 Rio de Janeiro, RJ, Brazil
(Address of principal executive office)
(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)
(Check One) Form 20-F þ Form 40-F o
(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1))
(Check One) Yes o No þ
(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7))
(Check One) Yes o No þ
(Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)
(Check One) Yes o No þ
(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b). 82-    .)
 
 

 

 


 

Table of Contents
     
Press Release
   
   

 

 


Table of Contents

     
(VALUE LOGO)
  Production Report
 
   
(VALUE LOGO)
Vale — 2010 Production Report
A YEAR OF STRONG RECOVERY
Rio de Janeiro, February 24, 2011 — Vale S.A. (Vale) operations had an outstanding performance in 2010. After facing the challenges stemming from the global recession of 2008/2009, one of the deepest in modern economic history, there was a strong recovery of the output of most of our products.
The production of iron ore of 308 Mt1 in 2010 achieved an all-time high figure. It was 29.4% above 2009 and 1.5% higher than the previous record level of 303 Mt attained in 2007, a year of fast global demand growth and full capacity operation. Carajás, which has the best iron ore deposits in the world, produced 101 Mt in this year, establishing a new record mark. At the same time, pellet production was 49 Mt, another all-time figure, surpassing the previous record of 45 Mt of 2007. In addition, new records were reached in the production of bauxite, at 14 Mt, and coal, 6.9 Mt.
The bulk of our Canadian nickel operations, encompassing the Sudbury and Voisey Bay sites, were negatively affected by a long strike, which started in 3Q09. Despite the labor interruption, we managed to keep the operations running, albeit at low levels of capacity utilization. With the end of the strike in Sudbury, the output of refined nickel began to increase in 3Q10 and in the last quarter of the year climbed to an annualized rate of 260,000 metric tons, an almost normal level of activity, even higher than the production number for 2007, of 248,000 metric tons.
The move towards normalization of our base metals production and its minor and precious metals by-products is taking place against a backdrop of high and rising prices, contributing to a significant enhancement of our financial performance.
In the first weeks of this year there were heavy rains and flooding in some parts of Brazil — where we have 100% of our iron ore operations — and in the state of Queensland, Australia — where our central Australian office, in Brisbane, and some of our coal mines are located. Although the rainfall was far heavier than the seasonal standard, the preemptive actions taken by our bulk materials operations were able to minimize output losses.
In the case of iron ore, so far losses have been minimal, estimated to reach only 600,000 metric tons (200,000 in the Southern System and 400,000 in the Southeastern System), which are in accordance with the seasonality pattern for the first quarter of each year and represent only a minimal portion of the total production target for 2011, 311 Mt2, thus being easily recoverable over the year. On the other hand, the estimated losses for our coal production in Queensland, at 500,000 metric tons, are relevant given the still small scale of Vale’s Australian operations.
Given the strong global demand for minerals and metals and the positive expectations for the near term, the excellence of our current operations and the upcoming capacity additions from soon to be delivered new projects, as well as those which are already being commissioned and ramped up, we expect the continuation of the outstanding operational performance and a significant contribution to shareholder value creation.
Annual production
                         
000’ metric tons   2008     2009     2010  
 
                       
Iron orea
    301,696       237,953       307,795  
Pelletsa
    44,763       23,856       48,993  
Coal
    4,094       5,420       6,893  
Nickel
    275       187       179  
Copper
    312       198       207  
Bauxite
    11,628       12,461       14,332  
Alumina
    3,431       5,910       5,805  
Aluminum
    542       459       447  
Potash
    607       717       662  
 
     
a  
Including Samarco’s attributable production.
 
     
1  
Mt = million metric tons
 
   
Kt = thousand metric tons
 
   
mt = metric tons
 
2  
Without Samarco’s attributable production.

 

1


Table of Contents

     
(VALUE LOGO)
  Production Report
 
   
(VALUE LOGO)
BULK MATERIALS
 
Iron ore
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
IRON ORE
    63,443       82,614       80,262       237,953       307,795       -2.8 %     26.5 %     29.4 %
Southeastern System
    24,554       31,530       30,028       88,503       116,913       -4.8 %     22.3 %     32.1 %
Itabira
    8,009       10,621       10,036       31,136       38,704       -5.5 %     25.3 %     24.3 %
Mariana
    7,921       9,697       8,933       28,922       36,635       -7.9 %     12.8 %     26.7 %
Minas Centrais
    8,624       11,212       11,058       28,444       41,574       -1.4 %     28.2 %     46.2 %
Midwestern System
    683       1,088       1,268       956       4,208       16.5 %     85.6 %     340.2 %
Corumbá
    423       749       876       423       2,829       16.9 %     107.0 %     568.7 %
Urucum
    260       339       392       533       1,379       15.5 %     50.8 %     158.8 %
Southern System
    14,599       20,258       18,214       55,242       74,703       -10.1 %     24.8 %     35.2 %
Minas Itabiritos
    5,241       8,275       7,470       18,124       30,050       -9.7 %     42.5 %     65.8 %
Vargem Grande
    5,234       5,938       5,127       20,578       22,065       -13.7 %     -2.0 %     7.2 %
Paraopeba
    4,124       6,044       5,617       16,539       22,587       -7.1 %     36.2 %     36.6 %
Northern System
    20,940       26,997       28,007       84,638       101,171       3.7 %     33.7 %     19.5 %
Carajás
    20,940       26,997       28,007       84,638       101,171       3.7 %     33.7 %     19.5 %
Samarco1
    2,667       2,741       2,746       8,614       10,800       0.2 %     3.0 %     25.4 %
 
     
1  
Vale’s attributable production capacity of 50%.
Vale’s iron ore production reached a new record in 2010, namely 307.8 Mt, with a year-over-year increase of 29.4%, thus surpassing the 2007 record of 303.2 Mt.
Production was 80.3 Mt in 4Q10, 2.8% below 3Q10, which in light of seasonality is a very slight decrease (4Q of each year tends to have a lower production than 3Q due to the beginning of the rainy season in the last months of the year, while the third quarter is the seasonally strongest quarter of the year for iron ore production).
Following its recovery in 3Q10, iron ore production in Carajás reached 28 Mt in 4Q10, expanding by 3.7% on a quarter-on-quarter basis and 33.7% year-on-year. Given its outstanding performance in the second half of the year, the 2010 output level of 101.2 Mt surpassed the previous record for Carajás, achieved in 2008, at 96.5 Mt.
The Southeastern System, which encompasses the Itabira, Mariana and Minas Centrais mining sites, reached a production of 30.0 Mt, decreasing 4.8% over 3Q10 due to seasonal factors and rising 22.3% over 4Q09.
The Southern System produced 18.2 Mt in 4Q10 against 20.2Mt in 3Q10, but increased 24.8% on a year-on-year basis.
Our iron ore mines, Urucum and Corumbá, located in state of Mato Grosso do Sul, Brazil, near the border with Bolivia and Paraguay, were aggregated under the newly created Midwestern System. It is the smallest of our Systems, with a production of 1.3 Mt in 4Q10 and a quarter-on-quarter increase of 16.5% and 85.6% year-on-year.

 

2


Table of Contents

     
(VALUE LOGO)
  Production Report
 
   
(VALUE LOGO)
 
Pellets
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
PELLETS
    8,750       13,638       12,210       23,856       48,993       -10.5 %     39.5 %     105.4 %
Tubarão I and II
    783       1,434       1,189       3,942       5,435       -17.1 %     51.9 %     37.9 %
Fábrica
    0       1,058       1,016       235       3,809       -4.0 %     n.m.       1521.6 %
São Luís
    0       1,656       1,154       3       4,545       -30.3 %     n.m.       177004.6 %
Vargem Grande
    1,125       1,425       1,061       2,159       5,174       -25.5 %     -5.7 %     139.6 %
Nibrasco
    2,150       2,395       2,493       5,791       8,958       4.1 %     16.0 %     54.7 %
Kobrasco
    764       1,163       1,201       1,653       4,748       3.3 %     57.2 %     187.3 %
Hispanobras1
    452       560       493       577       1,948       -11.9 %     9.1 %     237.7 %
Itabrasco
    815       1,049       769       1,471       3,621       -26.7 %     -5.7 %     146.1 %
Samarco2
    2,662       2,897       2,833       8,025       10,754       -2.2 %     6.5 %     34.0 %
 
     
1  
Vale’s attributable production capacity of 50.89%.
 
2  
Vale’s attributable production capacity of 50%.
In 4Q10, pellet production was 12.2 Mt, 10.5% lower than the previous quarter but 39.5% higher than 4Q09. The total volume produced in 2010 reached 49 Mt — a new all-time high, 9.3% higher than the 44.8 Mt record achieved in 2007.
There were some scheduled maintenance stoppages in 4Q10, which affected negatively output performance. The plants were under maintenance in October, São Luis in November, and Tubarão I and II in December while some Hispanobrás equipment was under maintenance during November.
Vargem Grande also had some operational issues, arising from the supply and quality of feed received.
The three pellet plants of the 50%-owned Samarco JV, which have a nominal capacity of 21.0 Mtpy, were operating at full capacity. Our attributable production was 2,833 Mt in 4Q10, 2.2% lower than 3Q10.
The Oman operations, in the industrial site of Sohar, Oman, are coming on stream. It has two pellets plants, each with a capacity to produce 4.5 Mtpy, thus adding 9.0 Mtpy to our production capacity. The two plants will produce direct reduction pellets.
Oman’s plant 1 is under commissioning and furnace heating, and is expected to start up production in March. Plant 2 is being assembled and is expected to reach the ramp up stage by the end of the first half of this year.

 

3


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
 
Manganese ore and ferroalloys
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
MANGANESE ORE
    545       472       477       1,657       1,841       1.0 %     -12.5 %     11.1 %
Azul
    513       372       391       1,382       1,550       5.1 %     -23.8 %     12.1 %
Urucum
    32       55       41       169       184       -25.0 %     27.2 %     9.0 %
Other mines
    0       46       46       105       106       -0.4 %     n.m.       0.8 %
 
                                                               
FERROALLOYS
    88       112       116       223       451       3.8 %     32.1 %     102.5 %
Brazil
    34       50       55       99       207       9.0 %     62.3 %     109.2 %
Dunkerque
    35       35       36       45       138       1.1 %     2.6 %     209.5 %
Mo I Rana
    19       26       26       79       106       -2.5 %     32.8 %     33.6 %
In 4Q10, manganese ore production was slightly higher than the previous quarter, coming to 477,000 t against 472,000 t in 3Q10. The annual output increased 11.1% when compared to 2009, reaching 1.8 Mt.
The production of Azul — our largest manganese mine — increased 5.1% on a quarter-on-quarter basis, reaching 391,000t. The use of new equipment has contributed to improve mining performance. The total production in 2010 was 12.1% above 2009.
Ferroalloy quarterly production was comprised of 51,000t of ferrosilicon manganese alloys (FeSiMn), 60,000t of high-carbon manganese alloys (FeMnHc) and 5,000 t of medium-carbon manganese alloys (FeMnMC). The total output was slightly higher than previous quarter, increasing by 3.8%.
Production for 2010 was 451,000t, more than doubling relatively to 2009, but still lower than the previous peak of 542,000t reached in 2007.

 

4


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
 
Coal
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
METALLURGICAL COAL
    659       814       770       2,527       3,057       -5.4 %     16.9 %     21.0 %
Integra Coal
    198       296       279       1,184       1,151       -5.7 %     41.0 %     -3.1 %
Broadlea
    25       0       0       252       101       n.m.       n.m.       -59.8 %
Carborough Downs
    245       289       367       604       1,216       27.0 %     50.0 %     101.3 %
Others
    191       229       124       487       590       -45.9 %     -35.2 %     21.1 %
 
                                                               
THERMAL COAL
    607       1,057       976       2,892       3,832       -7.6 %     60.7 %     32.5 %
El Hatillo
    368       830       830       1,143       2,991       0.0 %     125.7 %     161.8 %
Integra Coal
    103       114       74       702       305       -35.1 %     -28.0 %     -55.8 %
Broadlea
    27       0       0       497       165       n.m.       n.m.       -66.7 %
Others
    110       113       72       551       371       -36.3 %     -34.3 %     -32.7 %
Despite the adverse weather conditions in Australia and some operational issues, 2010 was our best year for coal operations, with all-time high levels of production for both metallurgical and thermal coal, 3.057 Mt and 3.832 Mt, respectively, totaling 6.9 Mt.
In 4Q10 Vale’s coal production reached 1.75 Mt, which was comprised of 770,000 t of metallurgical coal and 976,000 t of thermal coal.
Production of metallurgical and thermal coal at Integra Coal, in New South Wales, was 279,000 t and 74,000t, respectively, in 4Q10. Both metallurgical and thermal coal output were lower than in 3Q10.
Production at Carborough Downs, in Queensland, was 367,000 t in 4Q10, versus 289,000 t in 3Q10. Although Carborough Downs completed a long wall move in 4Q10, the increase in its yield on this quarter contributed to a higher output and its best ever quarterly performance.
Heavy and consistent rainfall during the fourth quarter resulted in 42 days of lost production at all other mines in the state of Queensland.
The thermal coal mine of El Hatillo, an open pit coal mine in Colombia, is ramping up and was also affected by bad weather conditions in the 4Q10 producing 830,000 t in 4Q10, in line with 3Q10.

 

5


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
BASE METALS
 
Nickel
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
NICKEL
    30       44       65       187       179       45.7 %     117.8 %     -4.2 %
Sudbury
    2       6       8       43       22       35.7 %     450.1 %     -48.5 %
Thompson
    10       5       8       29       30       75.2 %     -14.4 %     3.5 %
Voisey Bay
    4       10       25       40       42       160.7 %     571.6 %     6.6 %
Sorowako
    15       22       20       69       78       -9.7 %     34.7 %     13.9 %
Others*
    0       2       3       6       6       47.5 %     n.m.       0.0 %
 
     
*  
External feed purchased from third parties and processed into finished nickel in our operations
Total finished nickel production was 65,000 t in 4Q10, 45.7% up on a quarter-on-quarter basis, being our highest quarterly output since 1Q09. Most of this increase — about 15,000 t — was due to the significant contribution of Voisey Bay feed to refined nickel.
Voisey Bay mining and processing has been operating at full capacity for some time focusing on high grade feed to supply the Clydach and Thompson refineries. At the same time, Sudbury mining was more focused on high grade copper and was operating at levels much below capacity. Mining was ramped up only after the end of the strike and given the relatively long production cycle, from mined nickel to refined nickel, the fourth quarter still saw the numbers for refined nickel sourced from Sudbury at low levels, increasing to only 8,000 t from 6,000 t in 3Q10.
During 1H11, one of the two furnaces of our Copper Cliff smelter in Sudbury will remain shutdown for a minimum of 16 weeks, entailing an estimated output loss of 15,000 metric tons of finished nickel.
Production at Thompson in 4Q10 was 8,300 t, 75.2% up from the previous quarter as the operations had a one-month annual maintenance shutdown in 3Q10.
Finished nickel production sourced from Sorowako, Indonesia, was 19,600 t, down 9.7% from 3Q10 due to a maintenance shutdown in October at the Matsuzaka refinery in Japan. It was up 34.7% on a year-on-year basis as at 4Q09 the Sorowako matte was being diverted to the Clydach refinery to meet demand requirements which contributed to lengthen the production cycle at that time.
The commissioning of the Onça Puma ferronickel project is completed, with the production of the first metal was in the last week of January. The operation has a nominal production capacity of 58,000 t of nickel in ferronickel.

 

6


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
 
Copper
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
COPPER
    32       58       76       198       207       30.3 %     132.8 %     4.4 %
Sossego
    28       32       30       117       117       -6.0 %     8.8 %     -0.1 %
Sudbury
    2       14       14       42       34       -2.2 %     477.6 %     -19.9 %
Thompson
    0       0       1       1       1       n.m.       n.m.       0.0 %
Voisey’s Bay
    0       11       16       24       33       52.7 %     n.m.       36.1 %
Others
    2       1       15       14       22       925.6 %     668.3 %     61.8 %
Vale’s copper production was 76,000t in 4Q10, an increase of 30.3% on a quarter-on-quarter basis.
Production of copper in concentrates from the Sossego mine at Carajás was 6% lower than in the previous quarter due to the smaller volumes of feed received by the plant during this quarter.
Our Canadian operations delivered 46,000 t in 4Q10, 20,000t higher than 3Q10. In addition to the better performance of Voisey’s Bay, there was a contribution of copper ores purchased from third parties in previous quarters and processed into copper concentrates and anodes in Sudbury in 4Q10. These purchases allowed us to increase copper shipments in an environment of rising prices.
 
Nickel by-products
                                                                 
                                            % Change     % Change     % Change  
    4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
COBALT (metric tons)
    133       133       624       1,575       1,066       367.9 %     368.0 %     -32.3 %
Sudbury
    0       39       258       359       302       563.4 %     n.m.       -15.8 %
Thompson
    70       34       30       181       189       -11.2 %     -57.3 %     4.3 %
Voisey Bay
    63       60       288       971       524       378.7 %     358.6 %     -46.1 %
Others
    0       1       48       64       51       n.m.       n.m.       -20.2 %
 
                                                               
PLATINUM (000’ oz troy)
    2       3       26       103       35       756.7 %     1446.6 %     -65.8 %
Sudbury
    2       3       26       103       35       756.7 %     1446.6 %     -65.8 %
 
                                                               
PALLADIUM (000’ oz troy)
    4       7       35       152       60       378.1 %     721.0 %     -60.5 %
Sudbury
    4       7       35       152       60       378.1 %     721.0 %     -60.5 %
 
                                                               
GOLD (000’ oz troy)
    3       5       27       50       42       481.4 %     864.6 %     -15.8 %
Sudbury
    3       5       27       50       42       481.4 %     864.6 %     -15.8 %
 
                                                               
SILVER (000’ oz troy)
    26       194       443       1,245       1,492       127.8 %     1582.8 %     19.9 %
Sudbury
    26       194       443       1,245       1,492       127.8 %     1582.8 %     19.9 %

 

7


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
Similarly to nickel, there was a sharp increase in the production of cobalt, platinum group metals and precious metals in 4Q10.
Cobalt production in 4Q10 was 624,000 t, up 491,000 t from 3Q10 due to the ramping up of operations in Sudbury after the end of the labor interruption.
Production of platinum and palladium in 4Q10 was 61,000 troy ounces, which was 51,000 troy ounces higher than in 3Q10 and 55,000 troy ounces higher than 4Q09.
 
Bauxite
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
BAUXITE
    3,318       3,801       3,851       12,461       14,332       1.3 %     16.0 %     15.0 %
Trombetas
    1,738       1,883       1,834       6,258       6,808       -2.6 %     5.5 %     8.8 %
Paragominas
    1,580       1,918       2,017       6,203       7,524       5.2 %     27.6 %     21.3 %
Our production of bauxite in 2010 achieved an all-time high at 14.332 Mt, showing a significant growth against the mark 12.461 Mt in 2009. Due to the conclusion and further expansion of the Paragominas mining operations our bauxite production has more than doubled over the last five years, coming from 6.884 Mt in 2005 to 14.332 Mt in 2010.
A record quarterly output was reached in 4Q10, when Vale’s bauxite production totaled 3.851 Mt, 1.3% higher on a quarter-on-quarter basis and 15% year-on-year.
Vale’s production at Trombetas was slightly lower than during the previous quarter. But, on the other hand, Paragominas output reached an all-time high production of 2.0 Mt, 5.2% higher than 3Q10.
 
Alumina
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
ALUMINA
    1,477       1,442       1,448       5,910       5,805       0.4 %     -2.0 %     -1.8 %
Alunorte
    1,477       1,442       1,448       5,910       5,805       0.4 %     -2.0 %     -1.8 %
The production of alumina at the Barcarena refinery totalized 1.4 Mt in 4Q10, in line with its capacity.
 
Aluminum
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
ALUMINUM
    112       114       114       459       447       0.4 %     1.8 %     -2.6 %
Albrás
    112       114       114       450       447       0.4 %     1.8 %     -0.6 %
Valesul
    0                   9       0       n.m.       n.m.       n.m.  
The production of aluminum totalized 114,000 t in 4Q10, in line with quarterly and annual bases.

 

8


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
FERTILIZER NUTRIENTS
 
Potash
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
POTASH
    185       155       169       717       662       9.0 %     -8.8 %     -7.6 %
Taquari-Vassouras
    185       155       169       717       662       9.0 %     -8.8 %     -7.6 %
In 4Q10, production of potash was 169,000 t, a volume 14,000 t higher than 3Q10. The rise in output is explained by an improvement in asset utilization in mining.
 
Phosphates
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
Phosphate Rock
    n.a.       1,198       1,787       n.a.       5,255       49.1 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       721       725       n.a.       2,737       0.6 %     n.m.       n.m.  
Vale Fosfatados
    n.a.       477       480       n.a.       1,727       1.8 %     n.m.       n.m.  
Bayóvar
    n.a.       209       582       n.a.       791       n.m.       n.m.       n.m.  
 
                                                               
MAP — Monoammonium phosphate
    n.a.       229       245       n.a.       898       7.1 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       229       245       n.a.       898       7.1 %     n.m.       n.m.  
 
                                                               
TSP — Triple superphosphate
    n.a.       229       162       n.a.       788       -29.4 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       229       162       n.a.       788       -29.4 %     n.m.       n.m.  
 
                                                               
SSP -Single superphosphate
    n.a.       687       586       n.a.       2,240       -14.7 %     n.m.       n.m.  
Vale Fosfatados
    n.a.       637       545       n.a.       2,147       -14.5 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       50       41       n.a.       92       -18.1 %     n.m.       n.m.  
 
                                                               
DCP — Dicalcium Phosphate
    n.a.       144       101       n.a.       491       -29.8 %     n.m.       n.m.  
Vale Fosfatados
    n.a.       144       101       n.a.       491       -29.8 %     n.m.       n.m.  
Vale Fosfatados owns two phosphate rock mines, Araxá, in the state of Minas Gerais, and Cajati, in the state of São Paulo, Brazil. Alongside the mining operations, the assets also comprise four processing plants for the production of phosphates fertilizers located at: (a) Araxá, state of Minas Gerais; (b) Cajati, state of São Paulo; (c) Cubatão, state of São Paulo; (d) Guará, state of São Paulo.
Total production of phosphate rock, which is used to feed the output of phosphate nutrients, rose 49.1% compared to 3Q10. Vale Fertilizantes and Vale Fosfatados had an output performance in line with 3Q10. Bayóvar, our Peruvian phosphate rock mine, started to ramp up production in July and produced 582,000 metric tons in 4Q10.
The production of MAP (monoammonium phosphate) was 245,000 t, up 7.1% quarter-on-quarter, in response to the stronger demand in the Brazilian market.

 

9


Table of Contents

     
(VALE LOGO)
  Production Report
 
   
(GRAPHIC)
TSP (triple superphosphate) production decreased 29.4% compared to 3Q10, due to a maintenance stoppage in 4Q10.
The production of SSP (single superphosphate) from Vale Fosfatados reduced 14.5% from 3Q10 due to the maintenance stoppage in the Cubatão plant. Production of Vale Fertilizantes was 18.1% lower than in previous quarter due to a maintenance stoppage at the Catalão plant.
DCP (dicalcium phosphate) decreased by 29.8% on a quarter-on-quarter basis due to a maintenance stoppage at the Araucária plant.
 
Nitrogen
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   4Q09     3Q10     4Q10     2009     2010     4Q10/3Q10     4Q10/4Q09     2010/2009  
 
                                                               
Ammonia
    n.a.       108       140       n.a.       508       29.3 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       108       140       n.a.       508       29.3 %     n.m.       n.m.  
 
                                                               
Urea
    n.a.       77       146       n.a.       511       90.1 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       77       146       n.a.       511       90.1 %     n.m.       n.m.  
 
                                                               
Nitric Acid
    n.a.       119       120       n.a.       454       1.0 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       119       120       n.a.       454       1.0 %     n.m.       n.m.  
 
                                                               
Ammonium Nitrate
    n.a.       115       115       n.a.       447       0.1 %     n.m.       n.m.  
Vale Fertilizantes
    n.a.       115       115       n.a.       447       0.1 %     n.m.       n.m.  
In 4Q10 ammonia production increased 29.3% compared to 3Q10 due to the scheduled maintenance stoppage in the Araucária unit in 3Q10.
For further information. please contact:
+55-21-3814-4540
Roberto Castello Branco: roberto.castello.branco@vale.com
Viktor Moszkowicz: viktor.moszkowicz@vale.com
Carla Albano Miller: carla.albano@vale.com
Andrea Gutman: andrea.gutman@vale.com
Fernando Frey: fernando.frey@vale.com
Marcio Loures Penna: Marcio.penna@vale.com
Samantha Pons: samantha.pons@vale.com
Thomaz Freire: thomaz.freire@vale.com
This press release may include declarations about Vale’s expectations regarding future events or results. All declarations based upon future expectations. rather than historical facts. are subject to various risks and uncertainties. Vale cannot guarantee that such declarations will prove to be correct. These risks and uncertainties include factors related to the following: (a) the countries where Vale operates. mainly Brazil and Canada; (b) the global economy; (c) capital markets; (d) the mining and metals businesses and their dependence upon global industrial production. which is cyclical by nature; and (e) the high degree of global competition in the markets in which Vale operates. To obtain further information on factors that may give rise to results different from those forecast by Vale. please consult the reports filed with the Brazilian Comissão de Valores Mobiliários (CVM). the French Autorité des Marchés Financiers (AMF). and with the U.S. Securities and Exchange Commission (SEC). including Vale’s most recent Annual Report on Form 20F and its reports on Form 6K.

 

10


Table of Contents

Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
         
  Vale S.A.
(Registrant)
 
 
  By:   /s/ Roberto Castello Branco    
Date: February 24, 2011    Roberto Castello Branco   
    Director of Investor Relations   
 

 

11